Industrial & Residential

Radiation Bunker

Completed in 2019, this was a complex project both in fabrication and installation. 

The project involved 420 tonne of steel, installed in a narrow inner city location amongst existing structures.

This required precise logistics and transport coordination, lift jigs, 400mm thick solid steel walls with a radiation pod lowered into position.

Residential Units, North Lakes

Tilt panel residential units in North Lakes.

28 tonne of structural steel, basic Three Storey Units.

Kittyhawk Drive, Chermside

Apartment building completed in 2021, involving 200 tonne of structural steel.

This project had a substantial amount of architectural feature cladding frames, all installed using a Tower Crane. 

Delivering QUALITY WORKMANSHIP TO ANY METAL APPLICATION ON TIME AND ON BUDGET